Construction Photos

K06NC TV
September, 2003

[Studio]
[1] [2] [3] [4] [5] [6] [7]
[
Lift 1] [Lift 2] [Lift 3] [Lift 4]


Installation of the transmission gear was complicated, due to the small amount of available space in Container 4. The FM combiner for the site occupies most of the floor space, and only the far end had enough room for the TV combiner and equipment rack. We managed to get everything up and in, however.


Tight squeeze


A tighter squeeze
A tighter squeeze. The power to the breaker box was de-energized during this particular situation.


The new TV Combiner
The TV (aural/visual) combiner mounted on wall. We actually had about 10 inches to spare to make it fit.


transmitter rack
TV Transmitter Rack



The 5 ghz microwave system receiver


Go to Page 7

All photos (C) 2003
Don Mussell, Consulting Engineer



© 2003 Broadcast Engineering Services of Bonny Doon