Construction Photos

K06NC TV
September, 2003

[Studio]
[1] [2] [3] [4] [5] [7]
[
Lift 1] [Lift 2] [Lift 3] [Lift 4]


The Combiner, loaded on top of the truck, with more inside as well, ready to go. We had three truck loads of equipment to lift.



Luka, our pilot, maneuvers the first load to the ridge. He was very steady, and we managed to lift all of the equipment (1200 lbs) in 5 loads, in only 30 minutes.



The first 400 lbs of transmitters incoming!



Here comes the heliax!


Go to Lift 3

All photos (C) 2003
Don Mussell, Consulting Engineer